Marine Projects
There are no translations available.
Cliente:
IND - Instituto de Navegabilidade do Douro
DESCRIÇÃO DA OBRA:
Cais acostável com 220 m de extensão, incluindo porto de atracação de embarcações de recreio, edifício bar/restaurante e edifícios de apoio. Consolidação e recuperação urbanística da encosta junto à cidade de Peso da Régua, incluindo novas infrasestruturas urbanas.
SERVIÇOS:
Projectos de Execução de todas as especialidades. Assistência Técnica às Obras.
DATA:
1999 -
VALOR DA OBRA:
1.995.192,00€
- Image folder specified does not exist!
-
|
Client:
IND – Instituto de Navegabilidade do Douro
DESCRIPTION:
Wharf with 220 extension m, including port of mooring of recreation boats, building bar restaurant and buildings of support. Consolidation and urbanity recovery of the together hillside to the city of “Peso da Régua”, including new urban infrastructures.
SERVICES:
Tender Phase of all specialties. Technical assistance.
DATE:
1999 -
CONSTRUCTION COST:
1.995.192,00€
|
Client:
CÂMARA MUNICIPAL DE FIGUEIRA DE CASTELO RODRIGO
DESCRIPTION:
Wharf in the River Douro with 80 length m, including slope, building bar restaurant, support building. Urban arrangement of an area with about 6000 m2.
SERVICES:
Tender Phase of all specialties. Technical assistance.
DATE:
1999 -
CONSTRUCTION COST:
|
Client:
IND – Instituto de Navegabilidade do Douro
DESCRIPTION:
Wharves of 40 m, urban arrangement of the neighboring area and zone of car parking and accesses.
SERVICES:
Design for Public Bid, Preliminary study, Tender Phase of all specialties.
DATE:
2000
CONSTRUCTION COST:
399.039,00€
|
Client:
SAPEC Agro, S.A.
DESCRIPTION:
Rank of mooring consisting of four dukes of alba and respective causeways of access.
SERVICES:
Study of alternative in boxes or props and Tender Plan of props solution.
DATE:
1999
CONSTRUCTION COST:
1.246.995,00€
|
Client:
ETERMAR - AVEIRO
DESCRIPTION:
Variant Project (winning solution of public bid) and tender plan of the structures of the containment walls, of the marginal retention and the floodgates, in the repairing of the canals of Aveiro city.
SERVICES:
Tender Plan of structures and maritime construction. Technical Assistance.
DATE:
1999 -
CONSTRUCTION COST:
4.489.182,00€
|
Client:
Etermar S.A.
DESCRIPTION:
Tender project for construction of a Multipurpose harbour with 350 m long at -9,0 ZH.
Tender project for construction of mix terminal at -16,00 ZH with 300 m long and a Containers Terminal with 500m, both at -16,00 ZH.
Tender Project for a RO-RO Terminal and a Service Harbour at -9.0 and 60 m long.
Tender project for construction of a Navy Harbour with pear at -7.0 ZH and 137 m long.
DATE:
2006 - 2007
|
Client:
Somagec/ Etermar Trust
DESCRIPTION:
The project was about the construction of a harbour at -16,00 ZH with 500 m long, soil improvement with gravel columns as well as the placing of a relief prism and the earth plain of the back.
SERVICES:
Soundings Plan as well as their interpretation Preliminary project which was the base for the proposal, Improvement soil project, Project of the Pear structures (Boxes an heading beam).
DATE:
2007 - 2009
CONSTRUCTION COST:
50.000.000,00€
|
Client:
Société Générale des Travaux du Maroc
DESCRIPTION:
Tender project of an harbour with 360 m long and -12,5 and 14 ZH deep. It includes dredging plan, foundation project, Boxes project and heading beam prepared for the service loads of the mix terminal.
The earth-work of the back has been conceived to support overloads of 60 KN/m2.
SERVICES:
Soundings Plan, Preliminary Project, Tender Project, Technical Assistance.
DATE:
2008
CONSTRUCTION COST:
50.000.000,00€
|
Client:
Somagec/ Etermar Trust
DESCRIPTION:
The project was about the construction of a harbour at -7,00 ZH with 100 m long, a protection and access pier to the service harbour.
Besides these structures, it has been also planned a landing harbour for little vessels.
SERVICES:
Soundings Plan as well as their interpretation Preliminary project, Improvement soil project, Project of the harbour structures ( Boxes and heading beam).
DATE:
2007 - 2008
CONSTRUCTION COST:
8.000.000,00€
|
Client:
Somagec/ Etermar Trust
DESCRIPTION:
The project was about the construction of an access bridge with 7 m large and 700 m long and a harbour bridge with props with 40 m large and 150 m long.
The works consist in a pre cast concrete tray which is placed over a metal structure of beams supported in metallic piles filled with concrete.
The main piles and beams will be placed using sea means, while pre slabs and concrete “in sight” will be placed through using an advance car over the Harbour.
SERVICES:
Preliminary project and Tender Project.
DATE:
2006 - 2007
CONSTRUCTION COST:
30.000.000,00€
|
Client:
Somagec/ Etermar Trust
DESCRIPTION:
The project was about the construction of mix terminal at -16,00 ZH with 300 m long. It includes a dredging plan which does not affects the shore on the back, a project of soil improvement with gravel columns, as well as the caissons and coupling beam projects prepared for the service loads of the Mix Terminal.
The filling on the back of the quay has bean conceived to support overloads of 30 KN/m2 from 30 m of the pear and of 60 KN/m2 on the back of the quay.
SERVICES:
Soundings Plan, Preliminary, Soil improvement project Tender Project of Boxes and harbour equipments, Technical assistance.
DATE:
2005 - 2008
CONSTRUCTION COST:
30.000.000,00€
|
Client:
Somagec/ Etermar Trust
DESCRIPTION:
The project is about the construction of a Multipurpose harbour with 350 m long at -9,0 ZH, and a RO-Ro Terminal at the top of the harbour as well as an harbour for little vessels with 40 m long.
The building solution adopted was the construction of caissons in concrete, headed with a coupling beam also in concrete.
These caissons are supported by a layer in stone (0-20), placed over soil strengthened by gravel columns.
SERVICES:
Soundings Plan, Preliminary project Improvement soil project, Tender Project of caissons and harbour equipments, Technical Assistance.
DATE:
2005 - 2008
CONSTRUCTION COST:
22.000.000,00€
|
|