Bridges

Client:

SGTM – SOCIETE GENERAL DE TRAVAUX DU MAROC

 

Description:

Duplication project of the existing viaduct over the significant railway line to Casablanca Harbor, in Morocco.

The duplication involves the construction of a new viaduct next to the existing which is 240 m long and 9.90 m wide. The deck is in section caisson mixed steel and concrete. The main span over the railway lines has 38 m. The rectangular section pillars have a column head. They are supported, in general, by a block of 4 piles.

 

Services:

Plan of execution. The work was finished in 2011. 

 

Date:

2009

 

Estimated Construction Cost:

10.000.000,00€